Retaining structures
Generally speaking, any wall that sustains significant lateral soil pressure is a retaining wall. However, the term is usually used with reference to a cantilever retaining wall, which is a freestanding wall without lateral support at its top. For such a wall, the major design consideration is for the actual dimensions of the ground-level difference that the wall serves to facilitate. The range of its dimensions establishes some different categories for the retaining structure as follow
(a) Curbs
Curbs are the shortest freestanding retaining structures. The two most common forms are as shown in Figure 1(a), the selection being made on the basis of whether or not it is necessary to have a gutter on the how side of the curb. Use of these structure is typically limited to grade level changes of about 0.6m or less.
(b) Short retaining walls
Vertical walls up to about 3m in height are usually built as shown in Figure 1(b). these consists of a concrete or masonry wall of uniform thickness, vertical wall reinforcing, and transverse footing reinforcing are all designed for the lateral shear and cantilever bending movement plus the vertical weights of the wall, footing, and earth fills.
When the bottom of the footing is a show distance below grade on the low side of the wall and/or the lateral passive resistance of the soil is low, it may be necessary to use an extension below the footing – called a shear key – to increase the resistance to sliding. The form of such a key is shown in Figure 1(c)
Retaining wall design principles
Figure 1:- Retaining Structure
(c)Tall retaining walls
As the wall height increase it become less feasible to use the simple construction shown in Figure 1(b) or (c). The overturning moment increases sharply with the increase in height of the wall. For very tall walls one modification used is to taper the wall thickness. This permits the development of a reasonable cross section for the high bending stress at the base without an excessive amount of concrete. However, as the wall becomes really tall, it is often necessary to consider the use of various bracing technique, as shown in Figure 2.
Retaining wall design principles
Figure 2:- Tall Retaining Walls
Design Considerations.
In the design of free-standing retaining walls, the following aspects need to be investigated:
(a) the stability of soil around the wall;
(b) the stability of retaining wall itself;
(c) the structural strength of the wall;
(d) damage to adjacent structures due to wall construction.
The magnitude of the earth pressure which will be exerted on a wall is dependent on the amount of movement that the wall undergoes.
It is usual to assume for free-standing retaining walls that sufficient outward movement occurs to allow active (minimum) earth pressures to develop. The designer must ensure that sufficient movement can take place without affecting the serviceability or appearance of the wall.
Where it is not possible for the required outward movement to occur, for instance due to wall or foundation rigidity, higher pressures will develop and the wall must be designed for these.
Basic Loading
The basic pressure loading to be considered for the design is:
Normal Loading = static earth pressure + water pressure + pressure due to live loads or surcharge.
In general, the resulting design pressure for earth retaining structures should not be less than the pressure due to a fluid of unit weight 5kN/m3.
Other considerations
The possible occurrence of other design cases, or variation of the one above, caused by construction sequence or future development of surrounding areas should also be considered. For instances, additional surcharges may need to be considered and allowance made for any possible future removal of ground in front of the wall in connection with services, particularly if the passive resistance of this material is included in the stability calculations. The effect of excavation on the wall bearing capacity may also need to be considered.
For the determination of earth pressure, it is usual to consider a unit length of the cross-section of the wall and retained soil. A unit length is also used in the structural design of cantilever walls and other walls with a uniform cross-section.
Support of existing fill slopes
Fill slopes constructed in Hong Kong prior to 1977 are likely to have been end tipped or inadequately compacted. Such slopes may be subject to liquefaction under conditions of heavy rainfall, vibration or leakage from services, and resulting mud flows may have serious consequences. Undercutting of the slope toe, for retaining wall construction, will increase the risk of failure.
Soil Properties
General
For all walls higher than 5 meters, especially those with sloping backfill, the soil properties of natural ground and backfill should be estimated in advance of design from tests on samples of the material involved. In addition, special attention should be paid to the determination of ground water levels, particularly with respect to maximum probable values.
For less important walls, an estimation of the soil properties may be made from previous tests on similar materials. A careful visual examination of the materials, particularly that at the proposed foundation level, should be made and index tests carried out to ensure that the assumed material type is correct.
Selection and use of backfill
The ideal backfill for a minimum section wall is a free draining granular material of high shearing strength. However, the final choice of material should be based on the costs and availability of such materials balanced against the cost of more expensive walls.
In general, the use of fine-grained clayey backfills is not recommended. Clays are subjected to seasonal variation in moisture content and consequent swelling and shrinkage. This effect may lead to an increase in pressure against a wall when these soils are used as backfill. Due to consolidation, long term settlement problems are considerably greater than with cohesion less materials.
For cohesive backfills, special attention must be paid to the provision of drainage to prevent the built-up water pressure. Free draining cohesionless materials may not require the same amount of attention in this respect. They may still require protection by properly designed filter layers.
In Hong Kong, backfill for retaining walls usually comprises selected decomposed grainite or decomposed volcanic rock. This material is in general suitable for backfill provided that it is properly compacted and drainage measures are carefully designed and properly installed to prevent build-up of water pressure.
In fact, rock fill is a very suitable material for use as a backfill to retaining walls and consideration should be given to its use when available. In general, the rockfill should be well graded and have a nominal maximum size of 200mm. A well-graded densely compacted rockfill should not have more than about 2% finer than clip_image006if it is to remain free-draining.
Earth Pressure
The earth pressure which acts on an earth retaining structure is strongly dependent on the lateral deformations which occur in the soil. Hence, unless the deformation condition can be estimated with reasonable accuracy, rational prediction of the magnitude and distribution of each pressure in the structure is not possible.
The minimum active pressure which can be exerted against a wall occurs when the wall moves sufficiently for outwards for the soil behind the wall to expand laterally and reach a state of plastic equilibrium. Similarly, the maximum passive pressure occurs when the wall movement is towards the soil. The amount of movement necessary to reach these failure conditions is dependent primarily on the type of backfill material. Some guidance on the movements is given in Table 1.
Table 1:- Wall displacements required to develop active and passive earth pressure
Soil
State of Stress
Type of Movement
Necessary Displacement
Sand
Active
Parallel to wall
0.001H
Active
Rotation about base
0.001H
Passive
Parallel to wall
0.05H
Passive
Rotation about base
>0.1H
Clay
Active
Parallel to wall
0.004H
Active
Rotation about base
0.004H
Passive
-
Effects of surcharges
Load imposed on the soil behind the wall should be allowed for in design.
Uniform surcharge loads may be converted to an equivalent height of fill and the earth pressures calculated for the correspondingly greater height. For example, the buildings with shallow foundation may be taken as a uniform surcharge of 10kPa per storey. (Figure 1.3)
For example, the standard loading for highway structures in Hong Kong are expressed in terms of HA and HB loading as defined in BS5400: part 2: 1978. In the absence of more exact calculations, the nominal load due to live load surcharge may be taken from Table 2.
Table 2:- Suggested surcharge loads to be used in the Design of Retaining Structures
Road Class
Types of Live loading
Equivalent Surcharge
Urban Trunk
Rural trunk
(road likely to be regularly used by heavy industrial traffic)
HA +45 units of HB
20kPa
Primary Distributor
Rural main road
HA + 37.5 units of HB
15kPa
Footpath, isolated from roads, play areas
5kPa
.
Retaining wall design principlesFigure 3: Surcharge load cases
Effect of water
The presence of water behind a wall has a marked effect on the pressures applied to the wall. When the water intersect the walls, a hydrostatic pressure will exert against the wall, together with uplift pressures along the base of the wall. Even when there is no water in direct contact with the wall, such as when adequate drainage is provided, there is an increased pressure on the wall due to the increase earth pressure. The effect of water behind the wall is significant; the total force may be more than double that applied for dry backfill. Many recorded wall failures can be attributed to the presence of water.
The height to which water can rise in the backfill, and the volume of flow, are both of prime concern. To determine these the ground water conditions must be established. These may be best derived form the observation of groundwater conditions prior construction using piezometers. Notwithstanding the results of groundwater monitoring, the groundwater level assumed for design should be not lower than one-third of the retained height.
The effect of leakage from services can be significant. There is evidence from field measurements and failures in Hong Kong that this leakage contributes substantially to both perched and main groundwater tables. Where inadequate drainage is provided behind a retaining structure, there may be a damming effect which would result in raising groundwater levels locally and in the general areas. Such a rise may adversely affect the stability of slopes and retaining walls. Effective drainage measures should always be provided in such cases.
Stability of Retaining walls
The stability of a free standing retaining structure and the wall contained by it is determined by computing factors of safety (or stability factors), which may be defined in general terms as:
Fs = Moments or forces aiding stability / moments or forces causing instability
Factors of safety should be calculated for the following separate modes of failure and should apply to the 1 in 10 year groundwater condition:
(a) sliding of the wall outwards from the retaining soil,
(b) overturning of the retaining wall about its toe,
(c) foundation bearing failure, and
(d) larger scale slope or other failure in the surrounding soil.
The forces that produce overturning and sliding also produce the foundation bearing pressures and, therefore, (a) and (b) above are inter-related with (c) in most soils.
In cases where the foundation material is soil, overturning stability is usually satisfied if bearing criteria are satisfied. However, overturning stability may be critical for strong foundation materials such as rock and so on.
In general, to limit settlement and tilting of walls on soil materials, the resultant of the loading on the base should be within the middle third. For rock foundation material, the resultant should be within the middle half of the base.
When calculating overall stability of a wall, the lateral such pressure is calculated to the bottom of the blinding layer, or in the case of a base with a key, to the bottom of the key where the actual failure mechanism extends to that point.